Numbers that hold up under inspection.
Linear Feet Installed
Carbon steel, stainless, and specialty alloy — last 36 months across active project portfolio.
X-Ray Pass Rate
Radiographic weld inspection results across ASME B31.3 process piping and B31.1 power piping scopes.
Average Project Turnaround
Median mobilization-to-hydrostatic-test timeline for retrofit scopes under 2,000 linear feet.
Continuous ASME Certification
Uninterrupted Section IX stamp holder since 2001. No lapses. No provisional status. Filed and current.
Tools a project engineer would actually bookmark.
No whitepapers. No sales collateral. These are the working documents our crews use in the field.
Pre-Bid Scope Checklist
The exact 47-point checklist our estimators run before quoting any new construction or retrofit scope. Covers pipe specs, access constraints, inspection requirements, and tie-in isolation — so nothing gets missed in the walkthrough.
Pipe Material Selection Guide
Carbon steel vs. 316SS vs. CPVC vs. copper — broken down by service fluid, temperature range, pressure class, and code jurisdiction. Includes weld procedure qualifications on file for each material group.
Site Survey Template
The field form our foremen use on every pre-bid site walk. Captures existing pipe routing, support conditions, clearance measurements, and shutdown window constraints — formatted for direct handoff to engineering.
Unlock All Three Resources
Enter your work email to download.
No drip campaigns. One confirmation with your download links.
Tell us the scope. We'll tell you if we're the right crew.
Typical response within 4 business hours. Complex scopes may require a site walk before pricing.
Every certification stamped, filed, and current.
Documentation packages available for any scope. Owner's reps and inspectors don't wait on us.
Welding & Brazing Qualifications
Section IX stamp holder, continuous. All WPS/PQR documentation current and available for owner review.
Process Piping Code
Refineries, chemical plants, and industrial process systems. Design, fabrication, examination, and testing.
Power Piping Code
Steam generation systems, hospital central plants, and utility distribution. Hydrostatic test records retained.
Medical Gas Systems
ASSE 6010 certified installers on staff. All medical gas work verified and documented to NFPA 99 Chapter 5.
Structural Welding — Steel
Pipe rack fabrication and structural connections. CWI third-party inspection available on request.
National Board Inspection Code
Authorized for repair and alteration of ASME-stamped pressure vessels and boilers. R-stamp current.
"The joint either holds or it doesn't. We've been in the business long enough to know the difference between a weld that looks good and one that holds pressure at 3 AM on a Tuesday."
Dale Harmon
Field Superintendent — 31 years